PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Chopping concrete slab at the 2nd floor along column line E (South Elevation).jpg East Side of the Building.jpg Installed sprinkler pipes at the 2nd floor Facing North.jpg Laying out block at the 3rd floor detention cells Facing North.jpg Laying out block at the 3rd floor Detention cells Facing West.jpg Sprinkler pipe material.jpg 3rd floor Interior metal framing Facing North-West.jpg Constructing parapet along the High Roof Facing South-West.jpg Constructing the parapet along the high roof Facing East.jpg
Previous pageNext page Laying out block at the 3rd floor Detention cells Facing West
Laying out block at the 3rd floor Detention cells Facing West